Engineering Design Process & Construction Design


  • On-site and off-site works;
  • Roadworks and underground services;
  • Site grading and lot grading;
  • Waterworks, sanitary sewer and storm sewer services;
  • Drainage studies, storm water management, and drainage works;
  • Storm water detention/retention systems;
  • Erosion and sediment control works;
  • Sustainable drainage works including rain gardens, bioswales and storm water infiltration systems;
  • Engineering design including computer modeling;
  • Preparation of working drawings using computer software such as AutoCAD and Civil 3D;
  • Directing and co-ordinating with other consultants involved with the project; and
  • Submissions to and processing approvals through regulatory authorities.
Oleg Verbenkov
Talk to us

Talk to us about the engineering design and approval process through to construction. Please contact Oleg a senior planner and senior project manager with over 30 years of combined public and private sector experience in managing land use and development matters that include supportive disciplines such as: engineering, environmental, urban design, landscape architecture, survey, appraisal and land economics.

Typical Engineering Department Approval Process:

Typical Engineering Department Approval Process

For more information please download Engineering Land Development User Customer Manual or visit City of Surrey Land Development Division website.